Commercial roof replacement project

Client needs and Trioroofers results:

Client needs:

Trio roofers results:

To remove old system – torch down 2ply

Removed in 2 Days.

Fix and repair damaged base layer Plywood

total of 40 pieces was replaced.

Install ne underlaiment

Glass paper was installed - fire proof & water proof.

install new roof system - Torch down.

Torch down Asphalt roof system - Gray color was installed.

Commercial roof replacement

Before

During

After